Bridge 27 Preparation
Final Preparation for Phase 1
Over the weekend, the Dumper Routes were completed and secured at various points. This ensures trackside equipment protection and smooth tracks for dumpers, preventing tyre damage.
On Sunday, fencing around the bridge site began to be erected. After the last train was safely stowed, the team removed tracks on both sides of the bridge in preparation for piling works. The piling rig is currently on-site and poised to commence drilling the piles.