Bridge 27 Preparation
This weekend, the Gang has been building dumper crossings for use in the upcoming May possessions.
When the Piles are drilled out, the spoil created will be shipped up the railway to a dumping site by 2 9-ton Dumpers. To safely and efficiently get over the various points of work, we have built sleeper crossings so the dumpers can pass over the obstacles without damaging them.