Bridge 27 Preparation

It is the first day of work, and a lot has changed. Work is well underway, with the Pile Mat dug out at the Keighley side of the Bridge while drainage work is carried out on the Oxenhope Side of the Bridge.

There are not many photos from today due to the weather deciding to throw everything it had at us. Thankfully, the Gang has retreated to a Nice Warm Pub for the Evening.